Normal view

UK defense secretary’s phone number found online after Burnham hit by texting scam

17 August 2026 at 18:23

LONDON — The personal mobile phone numbers of three U.K. Cabinet ministers — including Defense Secretary Wes Streeting — have been found published online alongside their names.

The discovery comes after POLITICO reported that Prime Minister Andy Burnham fell victim to a texting scam — engaging with messages from someone impersonating Susie Wiles, Donald Trump’s White House chief of staff, before becoming suspicious the contact was illegitimate and ending the conversation.

After checking through a list of Cabinet members, POLITICO found three published on the web, for Streeting, Justice Secretary Alex Norris and Northern Ireland Secretary Chris Bryant. POLITICO is not pointing to where the numbers can be found to avoid further risking security.

All three ministers declined to comment on the record. The reference to Streeting’s number online has since been deleted, and officials are working to remove the other two.

Ministers are given secure government devices to conduct business for their briefs, in particular for high-risk roles like defense, and are expected to use those for non-personal comms.

A government spokesperson said: “The government has robust procedures in place to ensure the security of sensitive information.”

But Prerana Joshi, research fellow at the Royal United Services Institute (RUSI) think tank, said that having direct numbers for Cabinet ministers in the public domain is a risk, warning that numbers could be spoofed and used to call others at a time when the U.K. is “in a high threat situation” globally.

“In any civil space, if your number is exposed, a whole host of malign, nefarious or even opportunistic cyber criminals or cyber actors could get hold of it, and they have tactics,” Joshi said.

‘No significance’

Downing Street would not comment on the revelation that Burnham exchanged messages with the impersonator, citing “national security.”

One person briefed on the communications said a “few messages” were exchanged after the PM entered No. 10 but insisted they were “of no significance.”

It is unclear how the fraudster obtained Burnham’s number. POLITICO could not find it published online.

British officials initially feared Wiles’ phone had been hacked again. But a White House official said: “This incident had nothing to do with the Chief of Staff’s devices being hacked.”

It is not clear whether Burnham will change his phone number, as Boris Johnson did after the Popbitch newsletter revealed in 2021 that the then-prime minister’s details had been sitting online for years.

‘Full of traps’

The episode has sharpened questions over whether Burnham — who built his political brand on his informal style and being more approachable than other prime ministers — can carry on that way in No. 10.

A former national security adviser, granted anonymity to speak frankly, said the prime minister needs to “get into the habit” of having his security staff verify that messages reaching him are authentic.

National Security Adviser Jonathan Powell “could have phoned the White House in five minutes and checked whether Susie Wiles genuinely was texting the prime minister,” they said.

“Being a domestic politician and going on listening tours around the U.K. is one thing, but when you engage in the international world, it’s full of traps and full of risks,” the former adviser added.

“What starts off as a very informal chat can quickly get into some kind of business, and you could give away key details of an upcoming trip or the movements of Donald Trump,” they said.

Former Defense Secretary Ben Wallace — himself targeted by imposters posing as Ukraine’s prime minister in 2022 — said the incident “demonstrates our adversaries are always looking for weak points in our communications.”

While Downing Street has said nothing significant was discussed in the exchanges between Burnham and the imposter, Wallace said “there is always a risk of kompromat” being obtained by hostile actors.

As technology, such as AI voice cloning, improves, these sort of incidents are going to “happen more and more,” Wallace added.

Others have urged Burnham not to change tack.

Guto Harri, Johnson’s former director of communications, said: “It’s only a threat and it’s only an embarrassment if they give something away — and it doesn’t seem that he’s done anything like that.”

Harri said it was “good to have someone big enough not to have his calls screened from everyone” as prime minister.

“I don’t think it’s healthy that the civil service wants to control all access to the principal. If they had their way, nobody would be able to talk to a prime minister without going through them,” he said.

“We can’t say that politicians are not living in the same world as us … and then moan about them speaking to people like a normal human being.”

Harri conceded a new number might be a “good idea,” giving the prime minister a “clean slate.”

Dan Bloom contributed to this report.

Ukraine urges EU sanctions on Rosatom over allegations of nuclear safety violations

17 August 2026 at 18:13

Ukraine called on the European Union to sanction the Russian state nuclear company Rosatom on Monday, hours after a POLITICO investigation revealed allegations of safety and engineering failures at one of the company’s flagship projects.

“Rosatom is not just another energy company — it is the instrument of Russia’s ambition to secure a global monopoly in nuclear energy,” Foreign Minister Andrii Sybiha wrote on X.

He said the findings were further evidence that Rosatom was “not a reliable partner” and urged capitals to restart talks on EU sanctions. “No state should be doing nuclear business with a company complicit in war crimes,” he added, sharing a link to POLITICO’s article.

POLITICO’s investigation revealed warnings from Egyptian authorities and internal assessments by Rosatom regarding the construction of the El Dabaa nuclear plant. The documents obtained by POLITICO raised concerns ranging from the quality of concrete work to delays and management problems, while an Egyptian agency alleged “deliberate negligence” and violations of “nuclear safety culture.” Nuclear material has yet to be introduced at the site.

Rosatom previously defended its safety record at El Dabaa and pointed to regular scrutiny of the project by Egyptian, Russian and International Atomic Energy Agency officials. None of the allegations contained presented to Rosatom by POLITICO, have been “confirmed within the contractual, technical and oversight procedures envisaged by the project,” the company said in a statement.

It did not respond to a request for comment on Sybiha’s remarks on Monday.

Sybiha’s call puts renewed pressure on EU governments that continue to cooperate with Rosatom despite Russia’s war in Ukraine. In Hungary, the company is building two new reactors at the Paks II nuclear plant using the same VVER-1200 technology planned for El Dabaa.

Hungarian Prime Minister Péter Magyar last week challenged Rosatom’s claim that construction for the reactors remained on schedule, saying his government was carrying out a full review of the project.

‘Deliberate negligence’: Russian nuclear power company with EU operations accused of violating safety standards

17 August 2026 at 04:00

BRUSSELS — A Russian state-controlled corporation building a nuclear power plant in Hungary is facing allegations of safety, security and engineering failures at another project in Egypt that uses the same technology, according to internal documents obtained by POLITICO. 

In a confidential letter dated June 4 and addressed to a Rosatom executive, Egypt’s Nuclear Power Plants Authority describes “defects” affecting multiple reactor units and violations of “nuclear safety culture” as it builds the El Dabaa nuclear plant. The letter also cites “deliberate negligence” on the part of an official at the project. 

The tranche of documents was shared through an intelligence official who was granted anonymity because they are not authorized to speak to the media, and it has never previously been made public. It includes confidential company documents that describe construction delays and engineering concerns coming from Rosatom’s own reviews of the project. 

Since Russia’s full-scale invasion of Ukraine in 2022 prompted Europe to impose sweeping sanctions on the country, Rosatom has tried to convince European governments that it remains a reliable and competent supplier in the nuclear power market. But the accusations of safety breaches could add to existing concerns over the Kremlin-controlled company’s operations in the EU.

In an emailed statement to POLITICO, Rosatom said it upholds the highest levels of nuclear safety and had done so throughout the construction of El Dabaa. The company declined to comment on whether it had received the letter or the complaints from Egypt’s Nuclear Power Plants Authority, which did not respond to multiple requests for comment about its communications with Rosatom.

“The high standard of work organisation, the quality management system and the safety culture are affirmed by the sustained attention paid to the project by the political leadership of the Russian Federation and the Arab Republic of Egypt, as well as by the leadership of the International Atomic Energy Agency, whose representatives regularly attend key project milestones,” said the company by email, adding that a recent ceremony for one of El Dabaa’s reactor units was attended by Russian, Egyptian and IAEA officials.

Egypt’s El Dabaa is located on the Mediterranean Sea coast, some 300 km northwest of Cairo. | Alexander Ryumin/TASS via Belga

None of the allegations contained in the letter, presented to Rosatom by POLITICO, have been “confirmed within the contractual, technical and oversight procedures envisaged by the project,” read the company’s statement.

Egyptian Prime Minister Mostafa Madbouly said in July he expected the construction of all four El Dabaa reactors to finish by 2030, with the first reactor unit set to begin producing power by 2028. No nuclear fuel has yet been introduced to the site. Rosatom’s Egyptian plant will use the same technology at the heart of Hungary’s Paks II project, the Kremlin-backed nuclear expansion that has repeatedly raised tensions between Budapest and the European Commission.

The Commission told POLITICO it was not aware of the confidential documents and allegations they contain. “For the EU, nuclear safety is a key priority,” said a Commission spokesperson. 

They added that while the Commission was following the project’s developments, “issues of nuclear safety are [the] responsibility of the EU Member State concerned.”

Initially green-lit by Hungary’s former Prime Minister Viktor Orbán in 2014, the Paks II project became emblematic of Budapest’s alignment with Russian President Vladimir Putin and provided a foothold for Russian energy technology inside the EU. Work began on the project in February this year.

Construction begins on Hungary’s Paks II nuclear power plant, on Feb. 5, 2026. | Attila Kisbenedek/AFP via Getty Images

The Kremlin-controlled corporation also has plant projects in Turkey and China, while Germany is under fire for green-lighting a deal in July that will allow one of Rosatom’s subsidiaries to help produce nuclear fuel rods for a plant in Lower Saxony. The German government said the deal would be under strict national security controls.

The Egyptian government and its embassies in Belgium and the United States did not respond to multiple requests for comment.

The allegations

Once fully operational, the El Dabaa complex will contain four Russian-designed nuclear reactor units under the supervision of the Nuclear Power Plants Authority. In the letter sent by the Egyptian authority to Rosatom, an official at the agency wrote that uncompleted reactor units have already encountered defects.

Originally sent to Rosatom in English, the letter appears to have been translated into Russian for internal circulation. POLITICO is citing a version of the letter translated back into English.

“There has been a re-emergence of serious concrete defects, including voids behind the metal cladding at Unit 4, defects in the foundation slabs of Units 1, 2 and 3, which took a year to repair, and defects in the cellular structure in the cylindrical wall of the reactor building at Unit 4,” details the letter. 

The Egyptian agency then accuses Rosatom of “misleading methods” and “fictitious work” attempting to prove the plant’s construction is over halfway complete, “while a visual inspection at the site clearly shows that the main buildings of the nuclear island are still in the underground construction phase.”

Rosatom, the Egyptian authority alleges, also presides over an unprofessional workplace culture in which workers were caught in possession of  “prohibited alcoholic beverages” on the work site, used “forged passes and impersonated others to gain unauthorized access,” and took several “photos and videos taken at the construction site” that ended up on social media, “which negatively affected the reputation of the project.”

Workers produce elements of El Dabaa’s reactor building’s internal containment shell in Egypt’s Matruh region. | Alexander Ryumin/TASS via Belga

The letter makes reference to a serious accident on the construction site, which resulted in a worker suffering “a severe open fracture” and then being smuggled to a private vehicle, not to an “equipped ambulance,” which the Egyptian authority claims was done “intentionally” to cover up the incident.

“Such behavior represents a serious disregard for both human well-being and professional responsibility, and constitutes a gross violation of workplace safety regulations, nuclear safety culture and reporting obligations,” said the letter.

Four additional internal Rosatom business documents reviewed by POLITICO reinforce aspects of the Egyptian authority’s concerns, detailing delays, construction-quality problems and project-management failures. One Rosatom draft audit prepared internally in 2025 warned of a “significant risk of failure to fulfill” the company’s contractual obligations and forecast that the preliminary schedule of El Dabaa’s first reactor unit could slip by 18 months, from September 2028 to March 2030.

Future in doubt

The allegations contained in the documents cast a shadow over the Paks II project in Hungary and are likely to reinforce concerns in Brussels about entrusting critical European infrastructure to a company under the Kremlin’s control.

In a lengthy commentary by the Royal United Services Institute, a London-based defense and security think tank, researchers warned Western countries against doing business with Rosatom, citing its deep connections to Russian intelligence and its problematic role in forcibly running the occupied Zaporizhzhia nuclear power plant in Ukraine through military force.

For the government of Hungary’s newly elected Prime Minister Péter Magyar, the Rosatom revelations also present a new headache: Paks II remains indispensable to Hungary’s plans to decarbonize its electricity system and replace aging nuclear capacity. In an effort to reexamine Orbán-era policymaking, Magyar’s government recently opened a review into Paks II, questioning its hefty price tag and connections to Putin. 

Construction workers pose during the official ceremony for pouring concrete for Power Unit 4 at El Dabaa. | Alexander Yelistratov/TASS via Belga

Former Hungarian Green lawmaker Benedek Jávor, who focused on Paks II and was critical of the Orbán government, cautioned other governments about working with Rosatom. He told POLITICO he now believed the allegations coming out of El Dabaa could have far-reaching consequences for Rosatom and the fate of Paks II.

“They’ve already decided to reconsider the contract, and this was already communicated during the election campaign,” he said of Magyar’s government. “[This] information from Egypt will definitely be part of the evaluation.”

❌